Our projects
Kelowna International Airport YLW, British Columbia
Date: June 17 2017/ May 6th 2018
Product: Pavix CCC100
Owner: City of Kelowna
Products: Pavix CCC100
Project Description:
Kelowna International Airport is your link to the world, serving 1.6 million passengers annually. As one of the busiest airports in Canada. Kelowna International Airport is committed to the protection of the environment and always improving their environmental performance. PaviX CCC100 is a 100% green technology and YLW embraced the PaviX crystalline technology.
Golden Ears Bridge, Maple Ridge, Vancouver, British Columbia
Date: April 17 & 18 2018
Product: Pavix CCC100
Owner: Golden Crossing General Partnership
Products: Pavix CCC100
Project Description:
This famous landmark the Golden Ears Bridge, it spans the Fraser River connecting Langley and Maple Ridge. We were able to apply PaviX CCC100 to a six lane span of 250,000 sqft bridge deck. PaviX made CTV news the same evening as this was the first bridge in Canada to have PaviX be applied over an open body of water.
Vancouver Aquarium, Vancouver, British Columbia
Date: September 15th, 2018
Product: Pavix CCC100 & Sofix CCC700
Owner: City of Vancouver
Products: Pavix CCC100 & Sofix CCC700
Project Description:
Vancouver Aquarium is the heart of Stanley Park. Home to thousands of incredible ocean species and amazing aquatic life.
Sofix CCC700 was used to treat the negative side of their electrical room, moisture was seeping through from their reptile tank. Cleaners used to take 1.5hrs to clean the bat cave but now it take them half the time from one single application of PaviX.
Skogies Auto Spa, Kelowna, British Columbia
Date: October 2018
Product: Pavix CCC100
Owner: Chris Skogland
Products: Pavix CCC100
Project Description:
Skogies is the perfect place for PaviX CCC100 because the amount of water an auto spa uses. Outside their shop front is exposed to not only the elements but salt and food & beverage spills. With a single application of PaviX we can reduce Ice bond to the concrete and mitigate any potential slip and fall liabilities.
With Skogies not only being an Auto spa, they have a gas bar too. As you can imagine oil & grease stains being a constant, these stains are an eye sore. With rain cycles the Hydrophilic and Hygroscopic crystals will work together and push any dirt, oil and grease out.
British Columbia Institute of Technology, Burnaby, Vancouver, British Columbia
Date: September 18th 2018
Product: Pavix CCC100
Owner: BCIT/ City of Burnaby
Products: Pavix CCC100
Project Description:
Established in 1984, BCIT is one of the largest post-secondary institutions.
With public safety being paramount, BCIT asked us to treat their patio for the safety of their students and faculty. PaviX CCC100 will keep this new patio area protected from Ice build-up and looking clean with long lasting protection.
Elijah Smith Exterior Project, Government of Canada, Whitehorse, Yukon
Date: August 2018
Product: Pavix CCC100
Owner: City of Yukon
Products: Pavix CCC100
Project Description:
The main Federal Government Building for the Yukon. Situated in Whitehorse.
We were asked how their infrastructure could be protected after seeing the salt damage to the existing site. With winter lasting eight months, there was only on product that could do the job under the harsh weather situation.
Pavix CCC100 was applied to all new concrete structures built. Approved by Thibodeau Architecture and Design who manage many Government of Canada projects nationwide, were extremely impressed with the performance of PaviX.
Pixton Estate & Private Residence - Bench Design Landscape – Okanagan Valley
Date: March 2017
Product: Sofix CCC700
Owner: Private Residence/Unknown
Products: Pavix CCC100 & Sofix CCC700
Project Description:
Located in the beautiful Okanagan Valley British Columbia, Pixton Estate is one of the largest residential builds, subject to a lot of groundwater but using the combination of Sofix CCC700 & PaviX CCC100 will protect from this issue for a long time.
The shire size of this Estate needed its own fire suppression system, a tank to hold 2500 gallons, as the local system could not provide enough water in the event of fire. The tank was simply poured in place, treated with our SofiX CCC700 specially designed to hold back standing water, then treated the outside of the tank with Pavix CCC100 to ensure a clean wrapped envelope.