top of page

PaviX


…Recently ICC secured a six drum order of Pavix for a large national/international manufacturer.

This Mfg. was losing the top of the concrete where new (off the line) equipment was being parked.

Due to the need to run and operate the units post manufacturing and as a result, needing to de-ice the area in the winter months, the parking lot was being replaced approximately every 5 – 7 years. Upon being exposed and educated by Logan Contractors Supply’s, Troy Thompson, the Mfg., decided to do 50,000 sf this year, of the eventual 300,000 sf (36 drums). Large areas are out there should you be looking!

Tags:

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page